C3010 FH9 over FURNACE BROOK

1.55 MI TO JCT W CL2 TH2 · County 021, Vermont · Built 1988 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
101104002811041
Year Built
1988
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.