NH 12 NH103 over CONNECTICUT RIVER

NH VT SL · County 027, Vermont · Built 1969 · 2 Lanes · 9,229 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200153B00114202
Year Built
1969
Length
206.7 m (678.1 ft)
Max Span
54.9 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
9,229
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,718,000
Total Project Cost
$3,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.