I 00091 ML over I 91 OVER VT 131

I 91 EXIT 8 · County 027, Vermont · Built 1965 · 2 Lanes · 16,200 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
200091030S14202
Year Built
1965
Reconstructed
2021
Length
67.1 m (220.1 ft)
Max Span
25.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
16,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,683,000
Total Project Cost
$2,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.