TR 02 FAS 138 over POULTNEY RIVER

4.1 MI E JCT. VT.30 · County 021, Vermont · Built 1934 · 2 Lanes · 770 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200138000311172
Year Built
1934
Length
16.5 m (54.1 ft)
Max Span
15.8 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
770
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000
Total Project Cost
$490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.