C2006 over POULTNEY RIVER
0.05 MI TO JCT W VT 140 · County 021, Vermont · Built 2023 · 2 Lanes · 570 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.523897, -73.205744
This bridge is in worse condition than 9.8% of bridges in County 021. The average bridge in Vermont is 0 years old; this one is 3 years old.
Nearby Bridges
TR 02 FAS 138 over FINEL HOLLOW BROOK
Built 2019
VT 00030 ML over POULTNEY RIVER
Built 1939
VT 00031 ML over POULTNEY RIVER
Built 1923
TR 02 FAS 138 over POULTNEY RIVER
Built 1934
CR18 over POULTNEY RIVER
Built 2004
C2003 over POULTNEY RIVER
Built 2003
C2004 over POULTNEY RIVER
Built 2001
C3032 over LAVERY BROOK
Built 2008
TR 01 FAS 138 over POULTNEY RIVER
Built 1928
C3020 over LEWIS BROOK
Built 2001
Bridge Details
- Structure #
- 101117000711171
- Year Built
- 2023
- Length
- 36.3 m (119.1 ft)
- Max Span
- 35.1 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 570
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $764,000
- Total Project Cost
- $914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.