C2006 over POULTNEY RIVER

0.05 MI TO JCT W VT 140 · County 021, Vermont · Built 2023 · 2 Lanes · 570 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101117000711171
Year Built
2023
Length
36.3 m (119.1 ft)
Max Span
35.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
570
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$764,000
Total Project Cost
$914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.