VT 00346 ML over BROOK

3.6 MI W JCT. U.S.7 · County 003, Vermont · Built 1910 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
200107000602082
Year Built
1910
Length
7.6 m (24.9 ft)
Max Span
6.7 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
1,300
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$427,000
Total Project Cost
$577,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.