C3008 over HOOSIC RIVER

0.1 MI JCT TH8 & TH9 · County 003, Vermont · Built 1949 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100208004202081
Year Built
1949
Length
54.3 m (178.1 ft)
Max Span
21.3 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,589,000
Total Project Cost
$1,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.