I 00091 ML over I 91 OVER TH 27 BROAD

1.5 MI S EXIT 1 · County 025, Vermont · Built 1959 · 2 Lanes · 18,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
200091003S13072
Year Built
1959
Reconstructed
2010
Length
78.6 m (257.9 ft)
Max Span
29.9 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
18,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.