I 00091 ML over I 91 OVER US 5

I 91 EXIT 1 · County 025, Vermont · Built 1959 · 3 Lanes · 18,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
200091004S13022
Year Built
1959
Length
60.4 m (198.2 ft)
Max Span
29.3 m
Width
15 m (49.2 ft)
Lanes
3
Daily Traffic
18,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,410,000
Total Project Cost
$3,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.