I 00089 ML over I 89 OVER US2 WR WCRR

0.3 MI N EXIT 8 · County 023, Vermont · Built 1960 · 2 Lanes · 25,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200089042N12112
Year Built
1960
Reconstructed
1990
Length
274.9 m (901.9 ft)
Max Span
26.5 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
25,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,986,000
Total Project Cost
$11,036,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.