I 00089 ML over I 89 OVER MONT. S.H.

I 89 EXIT 8 · County 023, Vermont · Built 1960 · 3 Lanes · 25,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
200089041S12112
Year Built
1960
Length
46.6 m (152.9 ft)
Max Span
24.7 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
25,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,517,000
Total Project Cost
$2,567,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.