US 00007 ML over FURNACE BROOK

7.0 MI N JCT. U.S.4 E · County 021, Vermont · Built 1931 · 3 Lanes · 9,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
200019010811162
Year Built
1931
Reconstructed
1959
Length
31.1 m (102 ft)
Max Span
14.3 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
9,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,066,000
Total Project Cost
$2,216,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.