VT 00100 ML over I 89 UNDER VT 100

I 89 EXIT 10 · County 023, Vermont · Built 1960 · 2 Lanes · 13,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
200013019712182
Year Built
1960
Length
74.4 m (244.1 ft)
Max Span
22.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
13,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,039,000
Total Project Cost
$4,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.