C2002 over NEW ENGLAND CENTRAL RR

0.07 MI TO JCT W CL1 TH1 · County 023, Vermont · Built 2004 · 2 Lanes · 3,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
101218003512181
Year Built
2004
Length
11.9 m (39 ft)
Max Span
10.7 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,300
Material
Concrete
Design
Frame (except frame culverts)
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$566,000
Total Project Cost
$617,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.