C3022 over HUBBARD BROOK

@ JCT W CL2 TH3 · County 027, Vermont · Built 1919 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
101423002714231
Year Built
1919
Length
11.6 m (38.1 ft)
Max Span
10.1 m
Width
3.9 m (12.8 ft)
Lanes
1
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$169,000
Total Project Cost
$219,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.