NH 12A over BLOW-ME-DOWN BROOK

1.6MI. FROM PLAINFIELD TL · County 019, New Hampshire · Built 1959 · 2 Lanes · 2,429 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
005500710013900
Year Built
1959
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Lanes
2
Daily Traffic
2,429
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.