CORNISH TOLL BR RD over CONNECTICUT RIVER

VERMONT STATE LINE · County 019, New Hampshire · Built 1866 · 2 Lanes · 2,722 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
005500640010800
Year Built
1866
Reconstructed
1989
Length
136.9 m (449.1 ft)
Max Span
61.9 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
2,722
Material
Wood or Timber
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.