C3055 over PLUMBS BROOK

0.1 MI JCT TH55 & VT100 · County 025, Vermont · Built 1939 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
101321001713211
Year Built
1939
Length
14.9 m (48.9 ft)
Max Span
14 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$401,000
Total Project Cost
$451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.