C3065 over NORTH RIVER

0.1 MI JCT TH 65 & VT112 · County 025, Vermont · Built 2013 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101321004513211
Year Built
2013
Length
11.3 m (37.1 ft)
Max Span
10.1 m
Width
4.7 m (15.4 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$201,000
Total Project Cost
$251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.