C3014 over GREEN MOUNTAIN RWY.

0.04 MI TO JCT W VT103 · County 025, Vermont · Built 1913 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
101314003913141
Year Built
1913
Length
33.5 m (109.9 ft)
Max Span
11 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$849,000
Total Project Cost
$999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.