C3021 over HALL BROOK

0.03 MI TO JCT W C3 TH19 · County 025, Vermont · Built 2011 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101306004513061
Year Built
2011
Length
16.5 m (54.1 ft)
Max Span
15.8 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.