C3012 over RIDLEY BROOK

0.18 MI TO JCT W CL3 TH6 · County 023, Vermont · Built 1939 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
101206004012061
Year Built
1939
Length
19.5 m (64 ft)
Max Span
18.6 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$515,000
Total Project Cost
$565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.