I 00089 ML over I 89 OVER TH NO 7

1.6 MI N EXIT 10 · County 023, Vermont · Built 1961 · 2 Lanes · 28,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
200089049N12182
Year Built
1961
Reconstructed
2002
Length
30.8 m (101 ft)
Max Span
29.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
28,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.