C3009 over WHITE BRANCH GIHON RIVER

1.5 MI JCT TH13 + VT100 · County 015, Vermont · Built 2010 · 2 Lanes · 175 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
100803001608031
Year Built
2010
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Lanes
2
Daily Traffic
175
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.