C3009 over WHITE BRANCH GIHON RIVER
1.5 MI JCT TH13 + VT100 · County 015, Vermont · Built 2010 · 2 Lanes · 175 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
44.723992, -72.5727
This bridge is in worse condition than 7.9% of bridges in County 015. The average bridge in Vermont is 0 years old; this one is 16 years old.
Nearby Bridges
C3013 over WHITE BRANCH GIHON RIVER
Built 2020
C3013 over WHITE BRANCH GIHON RIVER
Built 2020
VT 00100 ML over GIHON RIVER
Built 1932
C3017 over GIHON RIVER
Built 1999
C3008 over STONY BROOK
Built 2023
C3007 over GIHON RIVER
Built 1983
VT 00100 ML over GIHON RIVER
Built 1932
VT 00100 ML over GIHON RIVER
Built 1929
C3017 over GIHON RIVER
Built 2023
C3025 over GIHON RIVER
Built 2015
Bridge Details
- Structure #
- 100803001608031
- Year Built
- 2010
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Lanes
- 2
- Daily Traffic
- 175
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.