C3017 over GIHON RIVER
1 MI E JCT VT100 · County 015, Vermont · Built 2023 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.703219, -72.541725
This bridge is in worse condition than 7.9% of bridges in County 015. The average bridge in Vermont is 0 years old; this one is 3 years old.
Nearby Bridges
VT 00100 ML over GIHON RIVER
Built 1929
C3017 over GIHON RIVER
Built 1999
C3025 over GIHON RIVER
Built 2015
VT 00100 ML over GIHON RIVER
Built 1931
VT 00100 ML over GIHON RIVER
Built 1931
VT 00100 ML over GIHON RIVER
Built 1932
C3013 over WHITE BRANCH GIHON RIVER
Built 2020
C3007 over GIHON RIVER
Built 1983
VT 00100 ML over GIHON RIVER
Built 1932
C3013 over WHITE BRANCH GIHON RIVER
Built 2020
Bridge Details
- Structure #
- 100803001308031
- Year Built
- 2023
- Length
- 12.2 m (40 ft)
- Max Span
- 11.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.