C3008 over LAPLATTE RIVER

0.25 MI S OF JCT TH9 CL2 · County 007, Vermont · Built 1995 · 2 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
8
Very Good

Bridge Details

Structure #
100407002604071
Year Built
1995
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$362,000
Total Project Cost
$512,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.