C2009 over LAPLATTE RIVER

0.2 MI TO JCT W CL3 TH14 · County 007, Vermont · Built 1939 · 1 Lanes · 200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
100404003104041
Year Built
1939
Reconstructed
1960
Length
26.8 m (87.9 ft)
Max Span
13.4 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
200
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$554,000
Total Project Cost
$604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.