C3021 over MILLER RUN
0.1 MI JCT TH 21 + VT122 · County 005, Vermont · Built 1928 · 1 Lanes · 5 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
44.587133, -72.085175
This bridge is in worse condition than 94% of bridges in County 005. The average bridge in Vermont is 0 years old; this one is 98 years old.
Nearby Bridges
C3003 over MILLER RUN
Built 1927
C3003 over MILLER RUN
Built 1940
I 00091 ML over I 91 OVER TH NO. 17
Built 1972
VT 00122 ML over MILLER RUN
Built 1940
I 00091 ML over I 91 OVER TH NO 17
Built 1972
VT 00122 ML over MILLER RUN
Built 1975
C3038 over MILLER RUN
Built 1919
C3032 over MILLER RUN
Built 1919
I 00091 ML over I 91SB OVER TH NO 1
Built 1972
VT 00122 ML over MILLER RUN
Built 1928
Bridge Details
- Structure #
- 100317002303171
- Year Built
- 1928
- Reconstructed
- 1974
- Length
- 14 m (45.9 ft)
- Max Span
- 13.1 m
- Width
- 4.5 m (14.8 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $360,000
- Total Project Cost
- $510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.