C3032 over MILLER RUN
0.05 MI JCT TH 32 +VT122 · County 005, Vermont · Built 1919 · 2 Lanes · 350 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.601547, -72.114933
This bridge is in worse condition than 44% of bridges in County 005. The average bridge in Vermont is 0 years old; this one is 107 years old.
Nearby Bridges
VT 00122 ML over MILLER RUN
Built 1928
C3041 over MILLER RUN
Built 2011
I 00091 ML over I 91SB OVER TH NO 1
Built 1972
I 00091 ML over I 91NB OVER TH NO 1
Built 1972
C3032 over MILLER RUN
Built 1982
C3038 over MILLER RUN
Built 1919
VT 00122 ML over MILLER RUN
Built 1974
C3003 over MILLER RUN
Built 1940
C3003 over MILLER RUN
Built 1927
C3021 over MILLER RUN
Built 1928
Bridge Details
- Structure #
- 100312001603121
- Year Built
- 1919
- Reconstructed
- 1963
- Length
- 16.8 m (55.1 ft)
- Max Span
- 16.2 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $506,000
- Total Project Cost
- $556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.