C3038 over CALENDAR BROOK

0.5 MI JCT TH 38 + TH 1 · County 005, Vermont · Built 1928 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
100314001703141
Year Built
1928
Length
13.1 m (43 ft)
Max Span
12.5 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.