C3045 over CALENDAR BROOK

0.1 MI JCT TH 45 + TH 1 · County 005, Vermont · Built 1926 · 2 Lanes · 150 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
2
Critical

Bridge Details

Structure #
100314000403141
Year Built
1926
Length
13.4 m (44 ft)
Max Span
12.5 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$481,000
Total Project Cost
$631,000