C3062 over SOUTH PEACHAM BROOK
AT JCT TH 62 + TH 1 · County 005, Vermont · Built 1974 · 1 Lanes · 20 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
0
Failed
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 0 | Failed |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.314489, -72.166533
This bridge is in worse condition than 97.6% of bridges in County 005. The average bridge in Vermont is 0 years old; this one is 52 years old.
Nearby Bridges
TR 01 FAS 216 over SOUTH PEACHAM BROOK
Built 1954
C2010 over SO. PEACHAM BROOK
Built 1948
C3081 over SOUTH PEACHAM BROOK
Built 1926
C3061 over PEACHAM HOLLOW BROOK
Built 1928
C2002 over PEACHAM HOLLOW BROOK
Built 1949
C3048 over PEACHAM HOLLOW BROOK
Built 1919
TR 01 FAS 216 over STEVENS RIVER
Built 1929
C2009 over STEVENS RIVER
Built 1988
C3056 over JOES BROOK
Built 1965
TR 03 FAS 215 over JOES BROOK
Built 1929
Bridge Details
- Structure #
- 100309003903091
- Year Built
- 1974
- Length
- 7.3 m (24 ft)
- Max Span
- 6.7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $134,000
- Total Project Cost
- $184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.