C2010 over SO. PEACHAM BROOK

0.1 MI TO JCT W CL2 TH1 · County 005, Vermont · Built 1948 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100301003703011
Year Built
1948
Reconstructed
1982
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.