Midvalley Hwy SB over I-80
Midvalley Hwy over I-80 · County 045, Utah · Built 2021 · 1 Lanes · 2,568 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
40.662361, -112.331281
This bridge is in worse condition than 17.1% of bridges in County 045. The average bridge in Utah is 0 years old; this one is 5 years old.
Nearby Bridges
Midvalley Hwy NB over I-80 EB & WB
Built 2021
HARDY SALT ROAD over I-80 (SR-80) EBL & W
Built 1971
I-80 Ramp to SR 36 over I-80 Mainline
Built 2020
I-80 (SR-80) EBL over COUNTY ROAD & UPRR
Built 1972
I-80 (SR-80) WBL over COUNTY ROAD AND UPRR
Built 1972
SR-201 WBL ON-RAMP over I-80 (SR-80) & UPRR
Built 1991
SR-201 EBL RAMP over UNION PACIFIC RAILROAD
Built 1991
SR-36 over UNION PACIFIC RAILROAD
Built 1980
I-80 WB over UPRR track
Built 2020
I-80 EB over UPRR track
Built 2023
Bridge Details
- Structure #
- 3F 892
- Year Built
- 2021
- Length
- 90.1 m (295.6 ft)
- Max Span
- 44.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 1
- Daily Traffic
- 2,568
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.