SR-201 EBL RAMP over UNION PACIFIC RAILROAD

BLACKROCK INTERCHANGE · County 045, Utah · Built 1991 · 1 Lanes · 9,549 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2C 770
Year Built
1991
Length
83.8 m (274.9 ft)
Max Span
43.6 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
9,549
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.