I-15SB (SR-15) over SR-39 12th St.in OGDEN
12th St. Intchg. in Ogden · County 057, Utah · Built 2008 · 3 Lanes · 78,486 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.245, -112.016389
This bridge is in worse condition than 20.9% of bridges in County 057. The average bridge in Utah is 0 years old; this one is 18 years old.
Nearby Bridges
I-15NB (SR-15) over SR-39 12th ST. in OGDEN
Built 2008
I-15SB ON-RAMP over UNION PACIFIC RAILROAD
Built 2008
I-15SB (SR-15) over UNION PACIFIC RAILROAD
Built 2008
I-15NB (SR-15) over UNION PACIFIC RAILROAD
Built 2008
I-15 NB OFF-RAMP over UPRR TRACKS
Built 2009
CO. RD. 7TH ST. over I-15 (SR-15) NBL & S
Built 1968
SR-126 over UNION PACIFIC RAILROAD
Built 2003
700 South over WILLARD CANAL
Built 1962
I-15SB (SR-15) over WEBER RIVER
Built 2008
SR-126 over WEBER RIVER
Built 2003
Bridge Details
- Structure #
- 3F 746
- Year Built
- 2008
- Length
- 45.9 m (150.6 ft)
- Max Span
- 44.7 m
- Width
- 19.8 m (65 ft)
- Lanes
- 3
- Daily Traffic
- 78,486
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.