I-15SB (SR-15) over WEBER RIVER

No.of Wilson Lane Intchg. · County 057, Utah · Built 2008 · 4 Lanes · 94,016 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3F 744
Year Built
2008
Length
43.3 m (142.1 ft)
Max Span
42.4 m
Width
23.4 m (76.8 ft)
Lanes
4
Daily Traffic
94,016
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.