I-15 (SR-15) SBL over PARK ROAD-INTER X-ROAD

KOLOB CANYON INTERCHANGE · County 053, Utah · Built 1959 · 2 Lanes · 22,515 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3D 633
Year Built
1959
Length
36.6 m (120.1 ft)
Max Span
13.7 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
22,515
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.