I-15 NB over Kolob Canyon Rd

I-15 NB over Kolob Cyn Rd · County 053, Utah · Built 2020 · 3 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1C1054
Year Built
2020
Length
27.1 m (88.9 ft)
Max Span
25.9 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
29,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.