I-15 (SR-15) SBL over 1600 NORTH ST. PAGES LN.

500 W.1600 NO. BOUNTIFUL · County 011, Utah · Built 1959 · 5 Lanes · 147,839 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3D 613
Year Built
1959
Reconstructed
1999
Length
40.8 m (133.9 ft)
Max Span
13.7 m
Width
20.4 m (66.9 ft)
Lanes
5
Daily Traffic
147,839
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.