SR-105 PARRISH LN. over UPRR and UTA TRACKS

W.of PARRISH LN.INT.-CNVL · County 011, Utah · Built 1970 · 5 Lanes · 6,087 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0C 578
Year Built
1970
Reconstructed
2008
Length
39.9 m (130.9 ft)
Max Span
16.2 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
6,087
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.