I-15 (SR-15) SBL over Union Pacific Railroad
1.1 MI NO of Provo Inter. · County 049, Utah · Built 2011 · 6 Lanes · 179,133 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.249175, -111.695503
This bridge is in worse condition than 19.3% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 15 years old.
Nearby Bridges
I-15 (SR-15) NBL over Union Pacific Railroad
Built 2011
I-15SB (SR-15) over UTA FRONT RUNNER TRACK
Built 2011
I-15NB (SR-15) over UTA FRONT RUNNER TRACK
Built 2011
I-15SB (SR-15) over 820 NORTH STREET
Built 2011
I-15NB (SR-15) over 820 NORTH STREET
Built 2011
I-15 SB. (SR-15) over PROVO RIVER
Built 2011
INDEPENDENCE AVE. over PROVO RIVER
Built 2006
I-15NB (SR-15) over PROVO RIVER
Built 2011
SR-114 GENEVA RD. over PROVO RIVER
Built 2007
I-15NB (SR-15) over 2000 SOUTH ST. in OREM
Built 2011
Bridge Details
- Structure #
- 3C 998
- Year Built
- 2011
- Length
- 59.3 m (194.6 ft)
- Max Span
- 57.3 m
- Width
- 30.7 m (100.7 ft)
- Lanes
- 6
- Daily Traffic
- 179,133
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.