I-15NB (SR-15) over UTA FRONT RUNNER TRACK

1Mi.No.of Center St.Int. · County 049, Utah · Built 2011 · 5 Lanes · 179,133 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1F 825
Year Built
2011
Length
40.3 m (132.2 ft)
Max Span
38.4 m
Width
27.1 m (88.9 ft)
Lanes
5
Daily Traffic
179,133
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.