I-80 (SR-80) EBL over RR. TRAIL @ ATKINSON CY.

1.4 MI.E.Silver Creek Int · County 043, Utah · Built 2012 · 2 Lanes · 14,445 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
2F 801
Year Built
2012
Length
46.6 m (152.9 ft)
Max Span
45.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
14,445
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.