RAMP I80EB to I15N over 1000 WEST STREET

250 SO.1000 WEST IN SLC. · County 035, Utah · Built 1999 · 1 Lanes · 61,660 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 645
Year Built
1999
Length
39 m (128 ft)
Max Span
38.1 m
Width
9.3 m (30.5 ft)
Lanes
1
Daily Traffic
61,660
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.