I-80 (SR-80) over JORDAN RIVER

1200 WEST 250 SOUTH SLC · County 035, Utah · Built 1963 · 6 Lanes · 75,181 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
0F 7
Year Built
1963
Reconstructed
1989
Length
25.5 m (83.7 ft)
Max Span
24.4 m
Width
35.4 m (116.1 ft)
Lanes
6
Daily Traffic
75,181
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.