SB RP to SR-114 EB over I-15 (SR-15) NBL and SBL

Provo Interchange · County 049, Utah · Built 2011 · 2 Lanes · 35,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2C 997
Year Built
2011
Length
93.6 m (307.1 ft)
Max Span
48.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
35,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.