SR-114 over UPRR UTA & 12th W.

Within Center St. Intchg. · County 049, Utah · Built 2011 · 6 Lanes · 34,552 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0F 820
Year Built
2011
Length
86.4 m (283.5 ft)
Max Span
35.5 m
Width
32.9 m (107.9 ft)
Lanes
6
Daily Traffic
34,552
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.