US-6 EB(SR-6) over UPRR and PRICE RIVER

7Mi.E.of Soldier Summit · County 049, Utah · Built 2009 · 2 Lanes · 9,151 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2C 949
Year Built
2009
Length
131.8 m (432.4 ft)
Max Span
50.9 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
9,151
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.