US-6 (SR-6) over PRICE CANYON SLIDE AREA
11 MI EAST SOLDIER SUMMIT · County 007, Utah · Built 1973 · 2 Lanes · 9,151 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.783458, -110.924189
This bridge is in worse condition than 37.5% of bridges in County 007. The average bridge in Utah is 0 years old; this one is 53 years old.
Nearby Bridges
US 6 over Crandall Canyon Wash
Built 2023
CO.RD. AT KYUNE over PRICE RIVER AND UPRR
Built 1962
COUNTY ROAD over PRICE RIVER
Built 1914
SR-6 over BEAVER CREEK
Built 2009
US-191 (SR-191) over PRICE RIVER
Built 1964
US-191 (SR-191) over WILLOW CREEK
Built 1962
US-6WB (SR-6) over PRICE RIVER AND UPRR
Built 1976
US-6 EB(SR-6) over UPRR and PRICE RIVER
Built 2009
US-6 (SR-6) over UTAH RAILWAY TRACKS
Built 1959
COUNTY ROAD over SPRING CANYON WASH
Built 1905
Bridge Details
- Structure #
- 0D 808
- Year Built
- 1973
- Length
- 124.3 m (407.8 ft)
- Max Span
- 7.6 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,151
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.